Payra power plant is a 1,320MW ultra-supercritical coal fired with two power generating units at Dhankhali, in the Patuakhali district of Bangladesh, approximately 235km away from Dhakar. It is the first power plant to come online, among a series of new thermal power projects being developed across the country as part of Bangladesh’s plan to increase its electricity generation capacity from 10,445MW to 24,000MW. The Consortium FINT-C3 (Ferbeck International SA and C3 Chimney Consultants and Construction Co., Ltd.) has been awarded an EPC contract of a 220 meter-high-concrete chimney by NEPC.
BCPCL awarded the EPC contract for the power plant to a Chinese consortium comprising China Energy Engineering Group Northeast No. 1 Electric Power Construction (NEPC), in March 2016.
P.T. Fabric Industrial Chimneys Asia
Fabricating, Engineering, Construction & Contractor
C/O Ferbeck : Unit E-F, 11th Floor, L'Avenue Office
Kav. 16, Jl. Raya Pasar Minggu (Pancoran) Jakarta 12780 Indonesia
Workshop: Marunda Center, Block E1, No. 9, Bekasi 17211 Indonesia
Office: +62 21 2908 8146
Mobile: +62 811 8813 005
Email: tria.anita@inlogroup.com