Lombok
Indonesia

PLTU Lombok FTP2, also known as Sambelia power station, is a 100-megawatt (MW) capacity coal-fired power plant in East Lombok, West Nusa Tenggara, Indonesia. The project is included in the 2013-2022 Electricity Supply Effort Plan of PT PLN Persero and in the 2015-2024 supply plan. This power plant is built by a consortium of Rekayasa Industri from Indonesia and Rafaco from Poland. All the components are imported from Europe, including Poland, Germany, the Czech Republic and Belgium. And the other components are manufactured domestically.

FERBECK INTERNATIONAL SA has been awarded an EP contract for one 90 meter-high-steel stack by Rekayasa Industri.

ABOUT THE PLANT

  • Type of plant
    Coal fired power plant
  • Owner
    PT PLN Persero, Indonesia
  • Contractor
    Rekayasa Industri, Indonesia

ABOUT THE STACK

  • Year
    Completed in 2020
  • Skin
    Twin steel liners with Derrick structure
  • Height
    90
  • Inner liner Ø
    3,000mm at the bottom
  • Liner
    Carbon steel liner
  • Structure
    Derrick structure

JAKARTA

Indonesia agent

P.T. Fabric Industrial Chimneys Asia
Fabricating, Engineering, Construction & Contractor
C/O Ferbeck : Unit E-F, 11th Floor, L'Avenue Office
Kav. 16, Jl. Raya Pasar Minggu (Pancoran) Jakarta 12780 Indonesia
Workshop: Marunda Center, Block E1, No. 9, Bekasi 17211 Indonesia
Office: +62 21 2908 8146
Mobile: +62 811 8813 005