Chattogram
Bangladesh

Completed in 2022, the Chittagong power plant is situated on the Bay of Bengal, 70 km south of Chittagong port in Bangladesh. This 2x612MW ultra-supercritical coal-fired power plant was developed under China’s Belt and Road Initiative through a joint venture between S. Alam Group, SEPCOIII, and HTG Development Group. The plant features two 27.9-meter-high fly ash concrete silos with a 15.6-meter diameter and 2650 cubic meters capacity each. FERBECK INTERNATIONAL SA was contracted to construct two 33.2-meter flue-gas desulfurization units.

JAKARTA

Indonesia agent

P.T. Fabric Industrial Chimneys Asia
Fabricating, Engineering, Construction & Contractor
C/O Ferbeck : Unit E-F, 11th Floor, L'Avenue Office
Kav. 16, Jl. Raya Pasar Minggu (Pancoran) Jakarta 12780 Indonesia
Workshop: Marunda Center, Block E1, No. 9, Bekasi 17211 Indonesia
Office: +62 21 2908 8146
Mobile: +62 811 8813 005
Email: tria.anita@inlogroup.com